The M107 mainline is a double-electrified track that passes through the fictive cities of Borhoi, Mighin, Feteşca, Făltihuşi (wich is also the most important city), Bârdăuţi, and other small villages. The Făltihuşi train station is the biggest and most important station of the route so far, being a node from wich begins the second most important line of this route, the L113 line! Line L113 was build not long after the completition of the M107 mainline, as a shorter way of transportation between the cities of Făltihuşi and Chiceava (wich is not yet built ingame). It begins from Făltihuşi as a double-electrified track, but after Huliaşi train station it merges to a single electrified track. From Ghiduşeni train station, the line L113 also loses the catenary and becomes a one way non-electrified track up to Chiceava, where it ends.
The M107 mainline continues it's journey and passes the cities of Bârdăuţi, Doroși, Vălodeni and Călăveni. At Doroşi, the mainline also extends into a industrial zone (to a wheat factory), part of the route wich will be expanded in the future updates. Near Vălodeni, from the M107 mainline and via a three-wayed junction, starts anoather segment of the M107, the L115 line, wich will be expanded in the future updates. The L115 line connects the city of Bragabeş, and it's stations along the way, with the main M107 line, making a easier way to travel to any other cities along the track.
From Vălodeni also starts the modernization of the track from the European Funds, to european standards, with new and better tracks and modernized catenary wich allows speeds up to 160, even 200 km/h! After Târgu Vălești, the main M107 line continues it's journey up to Doroşov (wich is not yet built ingame).
Looking the other way, after the Bănești train station, the M107 line splits. One way continues the M107 line throughout, until Retopîrceni where it ends. The other way goes to Buzdoieni making the L109 line. Neither Retopîrceni, nor Buzdoieni train staions, are not built in-game at this point, but will be expanded in the future!
This route is realised only by me, Streza Bogdan. It started in the summer of 2020 as an experimentation project and it remained this way. As it's only a project, it obviously does not respect 100% reality. Things like catenary wiring, INDUSI system and other details are not implemented, so don't expect a fully functioning route. Updates may happen if I feel I can add more value to this route.
Stay tuned!